Apply for Aurora
Menu
Industry
Independent power production, mini-grids and utility-scale solar (PPAs and wheeling)
Scope of work
Build, own and operate solar power plants
Timeline
6 to 18 months

What we do

We develop and operate utility-scale solar under PPAs and wheeling frameworks. Projects are staged in 10–40 MW blocks to manage risk, with grid-forming-ready designs, rigorous compliance and telemetry-verified availability once online.

We solve the system-level pain of capacity shortfalls, diesel reliance and tariff volatility. Our model brings bankable pricing, disciplined delivery and operated assets that report performance monthly to utilities and lenders.

How we work

Development and operation of ground-mount solar plants with utility interconnection, performance monitoring and long-term O&M.

Development & Permits

Land control, studies, ESIA-lite, interconnection applications.

Grid & Design

Utility-aligned plant design; PPA/wheeling structure.

EPC Oversight & Commissioning

HSE oversight, FAT/SAT, grid compliance; staged energisation.

Operate & Report

Telemetry, availability SLAs, compliance and lender reporting.

In numbers

~6 yrs
Payback Period under current tariffs.
>45 MW
IPP pipeline under review across group of companies.
20%
avg. Project IRR (unlevered).
+15 yrs
PPA backed offtake agreement - Private Sector & Utility-Scale

Planning a project?

Tell us about your site and what you need. The right person will get back to you.